UK Electricity Production

beta

Land at High Point Farm

Owner
TGC Renewables
Capacity
4.5 MW
Fuel
Solar
Est. live utilisation
0.0% (0.0 MW)
Location
Map of Land at High Point Farm

Nearby

South of Henley Hall5.0 MWSolar
Wigley Farm1.1 MWBiomass
Astley Solar Farm5.0 MWSolar
Waresley Landfill Site1.6 MWWaste
EnviRecover15.5 MWWaste
Land at High Point Farm