UK Electricity Production

beta

Ballinderry Road Solar Phase 2 (Lisburn)

Owner
RAD Energy One/ Island Green Power
Capacity
7.0 MW
Fuel
Solar
Est. live utilisation
4.3% (0.3 MW)
Solar altitude
9.3°
Location
Map of Ballinderry Road Solar Phase 2 (Lisburn)

Nearby

Ballinderry Road Solar Phase 1 (Lisburn)13.5 MWSolar
Hillside Solar Farm25.2 MWSolar
NI Cluster Lough Road5.39904 MWSolar
Knockcairn Road6.5 MWSolar
NI Cluster Moira Road5.93712 MWSolar
Ballinderry Road Solar Phase 2 (Lisburn)