UK Electricity Production

beta

Feb. 15, 2020 at 8:25 a.m. GMT

Total Production
29.10 GW Low
Carbon Intensity
145 gCO2/kWh Low
Renewables
50.0%
Low Carbon
27.5%
Fossil Fuels
22.5%
Biomass 2,099 MW 7.2%
CCGT 4,855 MW 16.7%
Coal 1,689 MW 5.8%
Hydroelectric 662 MW 2.3%
Interconnects 2,321 MW 8.0%
Nuclear 5,688 MW 19.5%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 98 MW 0.3%
Pumped Storage 0 MW 0.0%
Solar 3 MW 0.0%
Wind 11,688 MW 40.2%