UK Electricity Production

beta

May 13, 2024 at 11:35 a.m. GMT

Total Production
30.30 GW Low
Carbon Intensity
141 gCO2/kWh Low
Renewables
45.0%
Low Carbon
29.9%
Fossil Fuels
25.1%
Biomass 2,731 MW 9.0%
CCGT 7,558 MW 24.9%
Coal 0 MW 0.0%
Hydroelectric 396 MW 1.3%
Interconnects 4,119 MW 13.6%
Nuclear 4,695 MW 15.5%
OCGT 50 MW 0.2%
Oil 0 MW 0.0%
Other 371 MW 1.2%
Pumped Storage 254 MW 0.8%
Solar 5,483 MW 18.1%
Wind 4,646 MW 15.3%