UK Electricity Production

beta

May 16, 2024 at 1:30 a.m. GMT

Total Production
20.50 GW Very Low
Carbon Intensity
192 gCO2/kWh Moderate
Renewables
15.7%
Low Carbon
45.0%
Fossil Fuels
39.3%
Biomass 2,097 MW 10.2%
CCGT 7,815 MW 38.1%
Coal 230 MW 1.1%
Hydroelectric 98 MW 0.5%
Interconnects 4,510 MW 22.0%
Nuclear 4,713 MW 23.0%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 178 MW 0.9%
Pumped Storage 0 MW 0.0%
Solar 0 MW 0.0%
Wind 855 MW 4.2%