UK Electricity Production

beta

May 7, 2024 at 11:40 a.m. GMT

Total Production
32.20 GW Moderate
Carbon Intensity
148 gCO2/kWh Low
Renewables
35.4%
Low Carbon
36.6%
Fossil Fuels
28.0%
Biomass 2,552 MW 7.9%
CCGT 9,019 MW 28.0%
Coal 0 MW 0.0%
Hydroelectric 59 MW 0.2%
Interconnects 6,408 MW 19.9%
Nuclear 5,367 MW 16.7%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 168 MW 0.5%
Pumped Storage 0 MW 0.0%
Solar 7,651 MW 23.8%
Wind 974 MW 3.0%