UK Electricity Production

beta

May 7, 2024 at 9:05 p.m. GMT

Total Production
29.50 GW Low
Carbon Intensity
218 gCO2/kWh Moderate
Renewables
18.5%
Low Carbon
36.1%
Fossil Fuels
45.4%
Biomass 3,148 MW 10.7%
CCGT 13,031 MW 44.2%
Coal 350 MW 1.2%
Hydroelectric 301 MW 1.0%
Interconnects 5,298 MW 18.0%
Nuclear 5,362 MW 18.2%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 101 MW 0.3%
Pumped Storage 0 MW 0.0%
Solar 0 MW 0.0%
Wind 1,905 MW 6.5%