UK Electricity Production

beta

May 8, 2024 at 3:10 p.m. GMT

Total Production
32.78 GW Moderate
Carbon Intensity
125 gCO2/kWh Low
Renewables
42.0%
Low Carbon
32.3%
Fossil Fuels
25.7%
Biomass 3,138 MW 9.6%
CCGT 8,408 MW 25.7%
Coal 0 MW 0.0%
Hydroelectric 93 MW 0.3%
Interconnects 5,236 MW 16.0%
Nuclear 5,351 MW 16.3%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 200 MW 0.6%
Pumped Storage 0 MW 0.0%
Solar 6,574 MW 20.1%
Wind 3,776 MW 11.5%