UK Electricity Production

beta

May 8, 2024 at 4:30 p.m. GMT

Total Production
35.15 GW Moderate
Carbon Intensity
173 gCO2/kWh Low
Renewables
36.1%
Low Carbon
27.1%
Fossil Fuels
36.7%
Biomass 3,141 MW 8.9%
CCGT 12,915 MW 36.7%
Coal 0 MW 0.0%
Hydroelectric 143 MW 0.4%
Interconnects 4,201 MW 12.0%
Nuclear 5,338 MW 15.2%
OCGT 0 MW 0.0%
Oil 0 MW 0.0%
Other 504 MW 1.4%
Pumped Storage 0 MW 0.0%
Solar 5,133 MW 14.6%
Wind 3,772 MW 10.7%