UK Electricity Production

beta

Metheringham Heath (Farm AD)

Owner
Future Biogas (Blankney Estate)
Capacity
6.5 MW
Fuel
Biomass
Est. live utilisation
4.4% (0.3 MW)
Location
Map of Metheringham Heath (Farm AD)

Nearby

Metheringham Heath (Farm AD)