UK Electricity Production

beta

Race Bank (Phase 1)

Owner
Orsted (formerly Dong Energy)/ Macquarie Group
Capacity
286.5 MW
Fuel
Wind
Est. live utilisation
7.8% (22.2 MW)
Wind speed
4.34 m/s (9.7 mph)
Location
Map of Race Bank (Phase 1)

Nearby

Westermost Rough210.0 MWWind
Lincs270.0 MWWind
Lynn97.0 MWWind
Inner Dowsing97.0 MWWind
Skegness Solar Park4.9 MWSolar
Race Bank (Phase 1)